The facility needed a new concrete loading dock platform running from the existing stairs to the end of the building, finishing with a 45-degree end nearest the road. Amkat formed and poured a reinforced slab on an 8-inch concrete wall and footings, set to shed water away from the brick wall, with a yellow steel edge angle at the dock face.
Click any photo to enlarge. Use the arrow keys or swipe to move through the set.
Send drawings, a scope, or just a description of the problem. We respond fast and bid straight.
Request a Quote604-562-5982